By Andreas Christofides — licensed Florida general contractor CGC1537881, 20+ years of experience. Published November 4, 2026
A remodeling contract in Florida is more than a price and a signature. Florida law requires certain notices in residential construction contracts, and a good contract also settles the questions that cause most disputes: what exactly is included, when each payment is due, and what happens when something changes. Here is what to look for before you sign, whether the job is a kitchen in Naples or a condo on Marco Island.
If you have not yet checked the contractor's license, do that first. Our guide to verifying a Florida contractor license takes about two minutes. A contract with an unlicensed contractor gives you far less protection, no matter what it says.
Two notices are required by statute in most home remodeling contracts. Both apply once the contract is over $2,500, which covers almost every kitchen, bathroom or condo renovation.
If a contract over $2,500 is missing either notice, ask why before you sign. Their absence tells you something about how carefully the rest of the paperwork will be handled.
Florida does not set a maximum deposit, but it does attach obligations to a large one. Under section 489.126, a contractor who receives more than 10 percent of the contract price as an initial payment on residential work must apply for the necessary permits within 30 days and start the work within 90 days after the permits are issued, unless there is just cause or you agreed in writing to a longer period. If a contract asks for a large deposit, check that its schedule fits those deadlines. Our post on what a general contractor charges in Florida covers pricing and the other red flags in a quote.
For most remodels over $2,500, a notice of commencement is recorded with the county before work starts (section 713.13). The owner, or the owner's authorized agent, records it, and a copy must be posted on the job site before the first inspection. It is good for one year unless a different date is written on it. The form itself carries a warning worth reading: payments made after it expires are treated as improper and can result in paying twice for the same work. On a long project, ask who will track that date.
At the end of the job, Florida law also protects you before the last check. Under section 713.06, the contractor must give you a final payment affidavit stating that every subcontractor and supplier who served you notice has been paid, or listing who has not, and you hold the final payment until you have it. Ask for written releases of lien as the job is paid; the statutory lien notice itself tells owners to get a written release every time they pay.
The law sets a minimum. These are the items that prevent the arguments the law does not cover:
A contractor who writes contracts carefully can answer all five without looking anything up.
GC Pro West is a Florida Certified General Contractor, license CGC1537881. Every project starts with a written scope, changes are made by signed change orders, and every project carries a one-year workmanship warranty in writing. See how we approach kitchen remodeling in Naples and condo renovation.
Request a free consultation or call 239-307-8020, and we will walk you through the contract before you sign anything.